Product Catalogue
Request Catalogue
Two Gas Steam Boilers 12,500 kg/hour Installed Successfully in Bangladesh Paper Plant
Project Site
Bangladesh
Product Model
WNS12.5-1.25-Q
Application
Paper Plant
Item
Steam
A paper manufacturing plant in Bangladesh installed two gas fired steam boilers, each with a capacity of 12,500 kg/hour, to support paper production and drying processes. The project required large steam capacity and stable operation for continuous production.

The gas steam boilers were selected for their high thermal efficiency, reliable performance, and automated control systems, ensuring stable steam supply and energy-efficient operation.
Our technical team provided on-site installation guidance and commissioning support to ensure smooth start-up. Both boilers have been installed and commissioned successfully and are now running steadily.
Send Inquiry